New Hospital
Nuffield Health
Bournemouth
Salisbury Hospital - Net Zero Enabled Ward Block
Project details
- Client: Salisbury NHS Foundation Trust
- Location: Salisbury District Hospital
- Role: Lead Consultant, Architect, Building Surveyor, Principal Designer
We've worked closely with the Trust's to design a new build 24 ward block at Salisbury District Hospital.
To align with the Trust's sustainable aspirations, we've adopted a Fabric First approach, with the scheme designed as a Net Zero Carbon Enabled Operational Energy Building and BREEAM Excellent (in line with Wiltshire Core Strategy 2015). Significant improvements in elemental thermal performance alongside renewable technologies via Air source heat pumps and Photovoltaic (PV) panels to the new building have made this achievable.
Contact our Healthcare Team to discuss your project requirements.