Currently looking at the New Science Lab at Arnewood Academy project

Kendall Kingscott were appointed by the school to bid to the EfA for funding under the Condition Improvement Fund to refurbish a suite of labs and Prep Room that were suffering from numerous compliance issues and in severely poor condition.

The bid was successful in securing £250,000 for the Academy resulting in a complete refurbishment and remodelling of layouts to suit current teaching requirements.  The scheme was carried out during term time in a phased manner which worked exceptionally well and with minimal disruption to the school.

Kendall Kingscott are now working closely with the school on a number of other schemes, including a £2m project to reclad a SCOLA block.